Uncategorized

A Dynamic Analysis of Interest Rate and Logging Factors in Reducing Saw Timber Procurement Costs

Publish Year: 1995 Reference ID: and transportation. Wood flow from sawtimber to available sawlogs in the mill yard was evaluated using the technique of dynamic programming. This program was successfully linked with data processing (input) and interactive interpretation procedures (output). The power of the algorithm was increased by implementing separable programming. In this model a nonlinear transportation function was linked to linear logging and inventorying functions. Authors:
Member Download Price: $0.00 | Member Physical Price: $0.00

Wood harvesting operations were controlled in terms of financial expenditure and material flow at three related steps in the wood procurement system ?€” logging

You must be logged in to download any documents. Please login (login accounts are free) or learn how to Become a Member