Owing to the intangibles involved, planning and control of logging operations are very difficult. In the system described, the elements of a work cycle and influencing variables are first determined. Time-study data are then collected by a reliable sampling scheme and analyzed statistically. A control system based on a mathematical model is then established. The application of this system increased pulpwood hauling production and mechanical equipment by an average of 40 percent and sometimes as much as 75 percent.
You must be logged in to download any documents. Please login (login accounts are free) or learn how to Become a Member